28 June 2021 to 2 July 2021
Europe/Vienna timezone

Session

T4.5 - Resilience of the CTBT Monitoring Regime, including Lessons Learned from the COVID-19 Pandemic

O4.5
30 Jun 2021, 11:00

Presentation materials

There are no materials yet.

  1. Ms Katrin Hafner (Incorporated Research Institutions for Seismology (IRIS), Washington, USA)
    30/06/2021, 11:06
    T4.5 - Resilience of the CTBT Monitoring Regime, including Lessons Learned from the COVID-19 Pandemic
    Oral

    We review the impact of the COVID-19 pandemic on Global Seismographic Network (GSN) operations. GSN stations, of which 50 also serve as IMS auxiliary Seismic Stations, have been designed to operate autonomously with very little operator intervention for long periods of time. These design goals have been strenuously tested with the advent of the COVID-19 pandemic, as travel by both local...

    Go to contribution page
  2. Mr David McCormack (Natural Resources Canada, Ottawa, ON, Canada)
    30/06/2021, 11:21
    T4.5 - Resilience of the CTBT Monitoring Regime, including Lessons Learned from the COVID-19 Pandemic
    Oral

    We describe the standard pre-COVID mode of operations for the Canadian National
    Seismograph Network, a large continental-scale monitoring network, and for the associated IMS stations in Canada. We examine how the operational posture has evolve and then discuss the manners in which the posture was found suitable and unsuitable to respond to the challenges and constraints of the COVID-19...

    Go to contribution page
  3. Ms Noor Al-Alami (General Dynamics Mission Systems (GDMS), Chantilly, VA, USA)
    30/06/2021, 11:36
    T4.5 - Resilience of the CTBT Monitoring Regime, including Lessons Learned from the COVID-19 Pandemic
    Oral

    General Dynamics Mission Systems (GDMS) overcame new challenges and implemented innovative strategies to maintain International Monitoring System (IMS) minimum requirements during the COVID-19 pandemic. GDMS focused on five areas: on-site spares, enhanced training material, refined quality assurance processes, development of remote preventive maintenance, and the health and wellbeing of team...

    Go to contribution page
  4. Mr Thomas Ludwig Hoffmann (CTBTO Preparatory Commission, Vienna, Austria)
    30/06/2021, 11:51
    T4.5 - Resilience of the CTBT Monitoring Regime, including Lessons Learned from the COVID-19 Pandemic
    Oral

    The CTBTO Provisional Technical Secretariat is responsible for supervision and coordination of the IMS network operations, and for providing assistance to assure proper functioning of IMS facilities. Station Operators are responsible for the operation of the IMS facilities, in accordance with the Operational Manuals, while complying with facility specific contracts, agreements and...

    Go to contribution page
Building timetable...