8–12 Sept 2025
Hofburg Palace & Online
Europe/Vienna timezone
Register to join us at SnT2025!

Session

P4.2 Systems Engineering for International Monitoring System and On-Site Inspection

P4.2
12 Sept 2025, 09:00
Zeremoniensaal

Zeremoniensaal

Description

E-poster session with display of each e-poster on an assigned touchscreen

Presentation materials

There are no materials yet.
Mr Elyas Setiawan (Indonesian Agency for Meteorology, Climatology and Geophysics (BMKG))
T4.2 Systems Engineering for International Monitoring System and On-Site Inspection
E-poster

The Meteorology, Climatology, and Geophysics Agency (BMKG) is an agency that has an obligation to present earthquake data to the people of Indonesia. The earthquake data presented is obtained from 507 earthquake sensor sites spread throughout Indonesia. Earthquake data from all sensor sites is sent to servers located at the BMKG Center in Jakarta and the BMKG in Bali. Data transmission is...

Jade Lucas (Enviroearth), Mr Nicolas Brahy (Enviroearth)
T4.2 Systems Engineering for International Monitoring System and On-Site Inspection
E-poster

Building on its extensive experience in providing turnkey power solutions for remote scientific stations, Enviroearth has focused on improving its solutions by developing a new, standardized solar-powered power cabinet for stations with low power requirements. It addresses the challenges faced by remote locations, where reliable, sustainable energy sources are critical. Initially designed for...

Mr Hang Xue (HOPE investment and Development Corp. Ltd., China), Mr Lin Zhong (Tianjin Lantian Solar Technology Co. Ltd)
T4.2 Systems Engineering for International Monitoring System and On-Site Inspection
E-poster

For the most practical cases, the inspection team should be self-sufficient in the inspection area. From the energy requirement perspective, the inspectors need energy for their daily accommodation support. There are different categories of On-Site Inspection (OSI) equipment, more than 100 tonnes, which need electricity supply for normal functionality. This work provided a photovoltaic energy...

Mr andri setiyaji (Indonesian Agency for Meteorology, Climatology and Geophysics (BMKG))
T4.2 Systems Engineering for International Monitoring System and On-Site Inspection
E-poster

A total of 332 seismic stations operated by the Meteorology, Climatology, and Geophysics Agency (BMKG) utilize Global System for Mobile Communication (GSM) to transmit seismic data. Stable communication ensures the quality of transmission and the availability of seismic station data. Link Quality Estimation (LQE) can measure link quality based on physical metrics, thereby improving network...