In Indonesia, the CTBTO auxiliary seismic station network consists of one data center (NDC-BMKG) and six auxiliary seismic stations. Each station is in a different environmental condition and faces a unique set of troubleshooting challenges. According to the incident's history over the last five years, power and on-site communication issues were prevalent. The implemented troubleshooting is inadequate and it remains challenging because the issue persists/recurs. To achieve a long term solution, the station is required to be redesigned and existing equipment must be optimized while considering all existing constraints.

Promotional text

Optimizing station equipment and long term plans for station sustainability.

E-mail [email protected]
Oral preference format in-person

Primary author

Mr Destiawan Kriswibowo (PT. Mindotama Avia Teknik)

Co-author

Ms Rizkita Parithusta Assef (CTBTO Preparatory Commission)

Presentation materials