7–11 Nov 2016
Europe/Vienna timezone

IS01 Site Survey: Planning, Implementation and Results

Not scheduled
Poster 5. Analysis of Sources and Scientific Applications

Speaker

Eduardo Edmundo Quintana (Autoridad Regulatoria Nuclear (ARN))

Description

While planning the installation of IS01 with the Provisional Technical Secretariat (PTS) late 2015, the Autoridad Regulatoria Nacional (ARN) proposed a plot of land roughly 60 km to the east of Bariloche, Argentina for the station installation. Having been given a set property boundary, the PTS worked to design an optimal array geometry before performing the site survey. As part of a joint effort between the PTS and ARN, an eight element infrasound array was deployed for the month of July 2016, in what would be ideally the final Contact: [email protected], [email protected] installation configuration of the station. We present here a brief summary of the planning, deployment and results of this joint project.

Primary author

Eduardo Edmundo Quintana (Autoridad Regulatoria Nuclear (ARN))

Presentation materials

There are no materials yet.